Health & Medicine

    Class 4 Chemical Indicator, Cssd Equipment, Sterilization and Disinfection, Chemical Indicator

    Nanjing Jusha Display Technology Co., Ltd.
    • Type:Surgical Tape
    • Ethylene Oxide Sterilization:Without Ethylene Oxide Sterilization
    • Group:Adult
    • Size:20*2cm
    • Pack:500PCS,Box
    • Capacity:500000PCS,Year

    Base Info

    • Model NO.:9001
    • Feature:Disposable
    • Function:Waterproof
    • Disinfection:Disinfection
    • Transport Package:500PCS,Box
    • Specification:CE SGS
    • Trademark:JUSHA or OEM
    • Origin:China
    • HS Code:85285110

    Description

    Basic Info.

    Model NO. 9001 Feature Disposable Function Waterproof Disinfection Disinfection Transport Package 500PCS/Box Specification CE SGS Trademark JUSHA or OEM Origin China HS Code 85285110

    Product Description

    1.Detect air residual from entire load;
    2.Steady color change,easy to read;
    3.Lead free formulation.
    Class 4 Chemical Indicator, Cssd Equipment, Sterilization and Disinfection, Chemical Indicator

    Test cycle of the resistometer
    a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
    b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
    c)Maintain the conditions for the required exposure time.
    d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
    1.Detect air residual from entire load;
    2.Steady color change,easy to read;
    3.Lead free formulation.
    Test cycle of the resistometer
    a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
    b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
    c)Maintain the conditions for the required exposure time.
    d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
    1.Detect air residual from entire load;
    2.Steady color change,easy to read;
    3.Lead free formulation.
    Test cycle of the resistometer
    a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
    b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
    c)Maintain the conditions for the required exposure time.
    d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
    1.Detect air residual from entire load;
    2.Steady color change,easy to read;
    3.Lead free formulation.
    Test cycle of the resistometer
    a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
    b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
    c)Maintain the conditions for the required exposure time.
    d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
    1.Detect air residual from entire load;
    2.Steady color change,easy to read;
    3.Lead free formulation.
    Test cycle of the resistometer
    a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
    b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
    c)Maintain the conditions for the required exposure time.
    d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
    1.Detect air residual from entire load;
    2.Steady color change,easy to read;
    3.Lead free formulation.
    Test cycle of the resistometer
    a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
    b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
    c)Maintain the conditions for the required exposure time.
    d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
    1.Detect air residual from entire load;
    2.Steady color change,easy to read;
    3.Lead free formulation.
    Test cycle of the resistometer
    a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
    b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
    c)Maintain the conditions for the required exposure time.
    d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
    主站蜘蛛池模板: 河源市| 安庆市| 汤阴县| 双柏县| 灵山县| 喀喇沁旗| 朝阳县| 天津市| 桦甸市| 雷州市| 礼泉县| 平泉县| 松江区| 霍邱县| 扶绥县| 清新县| 泰宁县| 上饶县| 武陟县| 海安县| 新绛县| 图木舒克市| 佳木斯市| 台湾省| 六枝特区| 遂川县| 双江| 始兴县| 黎城县| 揭东县| 大兴区| 安溪县| 南岸区| 磐安县| 舞钢市| 灯塔市| 安康市| 昌乐县| 廉江市| 高陵县| 高碑店市|